This power plant has been sitting abandoned, being reclaimed by nature, since 1983 when the Tennessee Valley Authority cancelled construction on this plant.
Print - http://smu.gs/1c0hijb
This power plant has been sitting abandoned, being reclaimed by nature, since 1983 when the Tennessee Valley Authority cancelled construction on this plant.
Print - http://smu.gs/1c0hijb